WHY TESTING ON SITE ?

Routine test report of the factory may not provide sufficient information about the internal condition of the transformer after installation

Transformer conditions after a repair job

Diagnostics during the life time 

Possibilities for transformer manufactures to built up their service department to a second mainstay of their businesses

Introduction

Test cases for transformer testing on-site

Mobile transformer test system WV

  – General

  – Possible extensions

  – Technical background

Summary

WHY TESTING ON SITE ?

Routine test report of the factory may not provide sufficient information about the internal condition of the transformer after installation

Transformer conditions after a repair job

Diagnostics during the life time 

Possibilities for transformer manufactures to built up their service department to a second mainstay of their businesses

WHAT TO TEST ON SITE ?

Load and no-load losses

Induced voltage test

Applied voltage tests

TEST OF THE NO-LOAD LOSSES

Check the transformer after a repair job or maintenance

According to the IEEE 57.12.90: total harmonic distortion THD ≤ ۵% is acceptable

Martin Buschendorf

Nirogahian-ITCE-5-25

لینک کوتاه : https://nirogahian.ir/?p=6674

ثبت دیدگاه

قوانین ارسال دیدگاه
  • دیدگاه های ارسال شده توسط شما، پس از تایید توسط تیم مدیریت در وب منتشر خواهد شد.
  • پیام های مبنی بر شکایت ، اعتراض ، وقوع جرم و ... بدلیل وابسته نبودن این پایگاه خبری به نهادهای دولتی و لزوم پیگیری این موارد از طریق نهادهای ذیربط مانند قوه قضاییه و ... قابل انتشار و قابل استناد نمی باشد.
  • پیام هایی که حاوی تهمت یا افترا باشد منتشر نخواهد شد.
  • پیام هایی که به غیر از زبان فارسی یا غیر مرتبط باشد منتشر نخواهد شد.